3. Installation
1. Before installation, please make sure the input voltage
is conform to the one marked on the unit.
2. This product should be installed by a professional to
make sure it is fixed safely and is adjusted to a suitable
shining angle.
3. When installing this unit, please make sure there is
nothing flammable or explosive within 0.5 meters of
the unit. Make sure there is 15 mm free space around
the unit. Please make sure to use safety rope which
can support tenfold the weight of the unit to secure the
mounting.
4. Front Panel
1. Infrared receiver
2. Laser Aperture
3. LED Aperture (For model CITY BEAM 16 ONLY)
3
2
1
2
1