background image

Horizontal checking

1.

2.

3.

7.

4.

5.

6.

Mark the position of the visible laser line cross on the wall B (point 2).

Mark the position of the visible laser line cross on the wall A (point 1).

Switch the unit on.

Set the LAX-50 on a smooth level surface or on the tripod with the front
facing the wall.

Turn the complete unit 180° without altering the height of the laser.

Two parallel wall surfaces at least 5 m apart are required for the 
horizontal check.

Without changing the height of the laser, rotate it 180° to place the beam
near the mark on the first wall (step 3 / point 1 ).

Measure the vertical distance between point 1 and
point 3. The difference must not be greater than

5 m

10 m

15 m

5,0 mm

10,0 mm
15,0 mm

Maximum permissible figure

S

Now move the unit directly in front of wall B.

Set the unit's height so that the laser dot's height matches that of
point 2.

8.

1. Horizontal checking - Line level

2. Horizontal checking - inclination of the laser line

Check the laser line for inclination and perfectly straight
projection.

E1

E2

E3

Place the instrument in front of wall A - distance X = 5 m.

Rotate the instrument through 45°.
The distance of the laser line  (= point 4) from point M must not exceed 1,5 mm.

E4

F1

F2

F3

F4

F5

Calculate the centre line between point 1 and
point 3 and mark it (point M).

Rotate the instrument through 90°.

The distance of the laser line  (= point 5) from point M must not exceed 1,5 mm.

Maximum tolerances at
different distances.

5 m

10 m

15 m

1,5 mm
3,0 mm
4,5 mm

Maximum permissible figure.

X

Using the horizontal laser line, align the instrument with point M.

LAX-50.qxd  04.01.2007  15:13  Seite 17

Summary of Contents for LAX 50

Page 1: ...Laser LAX 50 Operating instructions en...

Page 2: ...1 3 1 2 1 2 3 2 1 2 3 2 75 m B1 B2 B3 C1 C2 C3...

Page 3: ...A 2 3 1 4 12 6 5 13 14 15 7 8 10 11 9...

Page 4: ...2m 1 mm 2m D1 E1 D2 D3 E2 E3...

Page 5: ...s 5m 16 E4 F1 F2 F3 F4 F5 ft 3 2 1 5 mm X 5m 1 5 mm...

Page 6: ...cted laser lines provide exact alignment working The different parts of this set enable a tripod or a long support pole to be constructed to suspend the instrument between the floor and the ceiling We...

Page 7: ...rizontal lines will appear after switching on The laser will automatically level itself The laser will flash if the inclination is too great I II III IV I II III IV Levelling at variable heights up to...

Page 8: ...levell ling range Checking the calibration You must create a reference to perform this test Fasten a plumbline near to the wall The laser unit should now be set up in front of this reference mark dis...

Page 9: ...mm 10 0 mm 15 0 mm Maximum permissible figure S Now move the unit directly in front of wall B Set the unit s height so that the laser dot s height matches that of point 2 8 1 Horizontal checking Line...

Page 10: ...too much is outside the self levelling range the laser cannot level itself automatically laser beam f fl la as sh hi in ng g Recycling programme for our EU customers In accordance with the WEEE regula...

Page 11: ...ns Care and maintenance Like any precision instrument handle the LAX 50 crossed line laser carefully and cautiously Laser type Technical data Self levelling range Output Levelling accuracy Batteries O...

Reviews: