Copyright By SRC
Design and Specification are subjected to change
Page 4
Step 2:
Position the Mounting Brackets (3) – 3 off, as shown in the
drawing, form the downside of the Rack Carrier and align the
holes to the Screws that pop out of the Top Rack and secure
the threads using the M8 Nuts (5) – 3 off.
Once secured and positioned, tighten the nuts, to torque as
indicated in the BOM table