background image

 

Copyright By SRC 
Design and Specification are subjected to change                                                                                                                                                                                     

 

 

 

Page 4 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step 2:  

Position the Mounting Brackets (3) – 3 off, as shown in the 
drawing, form the downside of the Rack Carrier and align the 
holes to the Screws that pop out of the Top Rack and secure 
the threads using the M8 Nuts (5) – 3 off. 

Once secured and positioned, tighten the nuts, to torque as 
indicated in the BOM table 

Reviews: