background image

 

Copyright By SRC 
Design and Specification are subjected to change                                                                                                                                                                                     

 

 

 

Page 3 

 

 

 

                

 

 

 

Step 1:  

Top Rack can be partially off-line, before being 
brought up for Installation/Mounting it to the 
Rack carrier 

Slide in the Taper Ring (2) – 3 off to and Screws 
M8 x 25 (4) – 3 off as per the Scope and Bill of 
Materials, in the 3 mounting holes as shown in 
the drawing 

Mounting Installation 

Reviews: