©2021 Spyker Spreaders/A Brinly-Hardy Co.
Page 14
1019225-D
c) Add the Nylon Flange Bushing (6) to the bolt
(45). *Be sure to have the extended notch of the
Flange facing the Lever.
Push the small extended notch of the Nylon
Flange Bushing (6) into the center hole of the
assembled Control Lever.
Add the Control Lever Spring (49) to the rest of
the exposed bolt.
Loosely
keep parts in place
with a Nylon Washer (2) & a Nylon Lock Nut (3).
Fig. 13a
45
51
Fig. 13c
45
6
49
2
3
Fig. 13b
45
51
After adding the
Control Lever to the
Linkage Rod (51),
rotate the lever forward
into the ON position
and push the bolt (45)
through.
Do
NOT
tighten (yet).
14.
Checking the Rate Gate
15. Rate Gate Adjustment
If the gate
IS
closed, skip to step 16.
If it is
NOT
closed, follow these steps:
a) Ensure the hopper is empty.
b) Turn the Spyker dial to #9. Remove the spring
tension on the gate control lever by moving the
lever to the Open position.
OPEN
(Dial Setting at 9)
OPEN
(View From Above)
44
44
73
Ensure the rate gate closes completely when
the gate control lever is pulled back and locked
into place.
Fig. 14
c) Loosen the two bolts (44) that attach the Control
Lever Stop (73).
d) Slide the Control Lever Stop (73) forwards very
slightly, then retighten bolts (44).