Spring Air Systems Truflow-TC Installation and Operating May 2021
12
OPERATION
Enclosures
Installation and Remote Wiring
Installation
The Truflow-TC system can be easily retrofit into existing kitchens or supplied with new hoods. The
recommended location for the RPD TC panel is in the kitchen within view of the cooking operation. The
enclosure is typically surface mounted but can also be recessed into the wall with a wall flange. The VFD’s
can be located in mechanical or electrical rooms, pantries or above in the ceiling space in the kitchen.
Both VFD’s and RPD-TC panels must be easily
accessible for service and maintenance.
A.
Electrical Requirements (RPD-P-TC) and Variable Frequency Controllers hood
mounted)
•
Power supply to the RPD-P-TC panel 120V/1/60- 15 amps
•
Interlock to the wet chemical system Dry Contact (optional)
•
Power wiring from the breaker panel to the exhaust variable Frequency drive.
•
Power wiring from the breaker panel to the supply variable Frequency drive. (For SV controlled
supply unit)
•
Power wiring from the exhaust variable Frequency drive to the exhaust fan disconnect switch
Truflow-TC RPD wall mount panel