Page 10
2. Next install the double wall slide per instructions on
page 31. Make sure water drains out of the slide bed
and the slide guard is level, then tighten.
3. Now install the Guard Wall and Wheel per instructions
page 21 and 23. Level and tighten.
4. Now install the Tic Tac Toe Panel per instructions on
page 25.
5. Install the Vertical climber per instructions on page 27.
6. Install the Pyramid roof per instructions on page 33.
Step 5: Concrete
1. Once all components and posts are tight and level, you
may concrete. A good rule of thumb is two 80 lb. bags
of concrete per hole. Do not “dry bag” the concrete,
always mix per instructions on concrete bag. Be sure to
leave concrete about 2” from the top of the ground to
allow backfill.
2. Be sure that all splattered concrete is washed off of the
posts and components while it is still wet.
3. Block off installation area for at least 48 hours.
Step 6: Final after 48 hours
1. Return in 2 days to backfill concrete, drill and install
drive (roll) pins per instructions, and install safety
surfacing.
2. Inspect all components to insure the hardware is tight
and all panels are level.
3. Make sure all tools and dropped hardware are removed
from play area.
4. Open the playground.
Summary of Contents for Ray 911-110
Page 1: ...Page 1 800 727 8180 www sportsplayinc com 911 110 Model Ray...
Page 11: ...Page 11 Top Down View Actual scale drawings are included at the end of these instructions...
Page 12: ...Page 12 Footing Diagram...
Page 14: ...Page 14 Side view of installed post...
Page 28: ...Page 28 Vertical Climber Plan...
Page 39: ...Page 39 1 2 3 4...
Page 40: ...Page 40 5 6 7 8...