background image

561-451 Combination Goal with Net Supports (Pair) 

Page 3 

Rev. 05/20/08

 

SportsPlay Equipment, Inc.,       5642 Natural Bridge, St. Louis, MO 63120      (314) 389-4140 

www.sportsplayinc.com

 

 
 
 
 

STEP #6: 

Attach 563-604 Net Support using: 
 
8 - 425-517 T-Clamps 
4 – 116-604 Hex Head Bolts 
8 – 226-601 Lock Nuts 
 
Place end opposite T Clamped end (see net support attachment 
detail C) into remaining footing holes. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

STEP #7: 

Mix and pour Pre-Mix concrete into net support footing holes 
 

NOTES:

 

Wait 48 hours for concrete to harden before using unit. 
 
DO NOT install where overhead electrical wires are present. 
  

 

 

MAINTENANCE INSTRUCTIONS: 

 
Check periodically for loose bolts, broken parts and replace immediately. 

 

 

 

 

Frame Attachment Detail “A” 

 
 

 

 

 
Frame Attachment Detail “B”

 

Net Support Attachment Detail “C”

Reviews: