561-451 Combination Goal with Net Supports (Pair)
Page 3
Rev. 05/20/08
SportsPlay Equipment, Inc., 5642 Natural Bridge, St. Louis, MO 63120 (314) 389-4140
www.sportsplayinc.com
STEP #6:
Attach 563-604 Net Support using:
8 - 425-517 T-Clamps
4 – 116-604 Hex Head Bolts
8 – 226-601 Lock Nuts
Place end opposite T Clamped end (see net support attachment
detail C) into remaining footing holes.
STEP #7:
Mix and pour Pre-Mix concrete into net support footing holes
NOTES:
Wait 48 hours for concrete to harden before using unit.
DO NOT install where overhead electrical wires are present.
MAINTENANCE INSTRUCTIONS:
Check periodically for loose bolts, broken parts and replace immediately.
Frame Attachment Detail “A”
Frame Attachment Detail “B”
Net Support Attachment Detail “C”