background image

561-451 Combination Goal with Net Supports (Pair) 

Page 2 

Rev. 05/20/08

 

SportsPlay Equipment, Inc.,       5642 Natural Bridge, St. Louis, MO 63120      (314) 389-4140 

www.sportsplayinc.com

 

 

ASSEMBLY INSTRUCTIONS 

 

NOTE: 

All threaded ends of bolts protruding beyond nuts must be cut off 
and/or peened to eliminate sharp edges.  No more than two threads 
should extend beyond face of nut. 
All washers, “T” nuts, and other fastener hardware used on round 
pipe or tubing must be hammered down to conform to the curved 
underlying surface to eliminate catch points. 
 
DO NOT tighten nuts more than hand-tight until entire assembly is 
completed. 
 

STEP #1: 

Mark and dig footing holes 
 

STEP #2: 

Place 563-614 Uprights in Footing Holes. 
 
Brace uprights so that the bottom does not rest on the footing 
hole bottom.  Make sure uprights are level.  At least 2’0” of 
upright should be in footing hole. 
 

STEP #3: 

Pour footings using: 
 
12 – 80lb. Bags Pre-Mix Cement – 3 bags per hole. 
 
Be sure to ‘cone’ the top of the pour for drainage. 
 

STEP #4:

 

Attach 563-314 Frame using: 
 
6 – 116-604  Hex Bolts 
6 – 226-601  Lock Nuts 
 
See Frame Attachment Detail A and B. 
 

STEP #5: 

Attach 563-215 Posts onto Frames using: 
 
8 – 196-802 Socket Set Screws 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Reviews: