4-6. Insert the lower cable as indicated by the arrows, first into the lower side of pulley
B (81). Secure pulley B (81) with covers and hardware (62,78,79,82,83). Continue
threading the cable to incorporate other pulleys. Route the cable through the top of
the lower pulley A (80), then secure that pulley with hardware (62,77,78,79) onto
the floating pulley (22). Finally, secure the cable to the lower stack plate as shown.
When securing cover (82), make sure the cover does not interfere with cable
motion and is parallel to the cable.
NOTE:
-29-
Summary of Contents for DF-105
Page 1: ......
Page 4: ... 2 2 1 DIMENSIONS CHAPTER 2 INSTRUCTIONS ...
Page 9: ... 7 CHAPTER 3 ASSEMBLY INSTRUCTIONS STEP 1 Main Frame and CAM Assembly ...
Page 16: ...STEP 2 14 Weight Plate Installation ...
Page 18: ... 16 2 2 Remove hardware 70 71 72 Then guide the guide rods 73 downward as shown ...
Page 22: ... 20 2 7 Tilt the guide rods 73 back into place ...
Page 24: ...STEP 3 22 Apply the Weight Stack Sticker ...
Page 26: ...STEP 4 24 Cable Installation ...