RUNNING/CONNECTING THE CONTROL CABLE 

(For scoreboards with Wireless Remote Control, skip this step.) 

 

 

The control cable may be buried with or without conduit if it is direct burial-rated.  If it is not direct 

burial-rated  cable,  then  it  must  be  buried  in  sealed,  watertight  conduit.    The  same  is  true  for  the 
electric cable powering the scoreboard.  The two may be buried in the same trench but they must be 
kept at least 4-

6” apart.  If conduit is required for both, separate conduits must be used. 

The  control  cable  should  run  from  the  scoreboard  to  a  location  that  is  within  20  feet  of  the 

scorekeeper’s  location.    Here,  the  supplied  junction  box  cover  should  be  installed  in  a  2x4,  single-
gang  junction  box.    The  keyboard  will  connect  to  the  receptacle  on  the  junction  box  cover  via  the 
included 20-ft. control cable. 

 

At the scorekeeper’s location

 

1.  Bring  the  control  cable  into  a  2x4  single-gang  junction  box  located  within  20  feet  of  the 

scorekeeper. 

2.  Connect the leads inside the junction box to those on the junction box cover using the crimp-on 

butt connectors already attached to the leads on the junction box cover.  Connect the leads in 
the control cable to those on the junction box cover according to the label on the junction box 
cover.   

 

 

 
 

 

NOTE:

  If the colors of the wires in the control cable differ from those referenced on the label 

or shown in the following diagrams, make a note of what color lead on the junction box cover 
you connect to what color lead in the control cable.  Keep this information for reference when 
connecting the other end of the control cable to the terminal block inside the scoreboard. 

 

3.  Secure the junction box cover to the installed junction box. 

 

At the scoreboard

 

1.  Remove the signal/power access door located on the back of the scoreboard.  For access door 

location, refer to the diagram on the following page. 

2.  From the ground, run the control cable through sealed, rain tight conduit then through a rain-

tight  conduit  fitting  into  the  left  side  of  the  signal  cable/power  access  door  and  into  the 
scoreboard. 

3.  Inside  the  scoreboard,  connect  the  control  cable  leads  to  the  appropriate  terminals  on  the 

terminal block, according to the label above the terminal block. 

Summary of Contents for SSB-3328DSP

Page 1: ...1 INSTALLATION INSTRUCTIONS MODEL SSB 3328DSP...

Page 2: ...IENTATION 4 INSTALLING THE MOUNTING POLES BEAMS 5 ASSEMBLING THE SCOREBOARD 6 MOUNTING THE SCOREBOARD 7 RUNNING CONNECTING THE CONTROL CABLE 9 At the scorekeeper s location 9 At the scoreboard 9 RUNNI...

Page 3: ...below If you find that damage has occurred during shipping 1 accept the shipment from the carrier DO NOT refuse the shipment 2 follow the instructions for filing a freight damage claim found below an...

Page 4: ...left section assembly to the mounting poles beams 6 Mount the right section assembly to the mounting poles beams 7 Connect wiring and install crossover bushings between cabinets C in the left section...

Page 5: ...eet zero inches center to center with 20 6 of pole beam above ground refer to the installation diagram below If a sponsor panel is to be mounted above the scoreboard leave 23 6 of pole beam above grou...

Page 6: ...d cabinet C on the right Align the cabinets so that they are flush across the top and bottom and the edges of the cabinets are touching Each cabinet is lettered A through G on the back 3 Using two of...

Page 7: ...ctions should be made between cabinets before the access doors are replaced Inside each set of access doors connect all wiring harnesses between cabinets For each set of harness connections between sc...

Page 8: ...seam between the first SPD 8 sponsor section and the second DSP 8 sponsor section should be centered on the far left I beam 3 Secure the scoreboard to the I beam using the mounting angle irons alread...

Page 9: ...on the junction box cover using the crimp on butt connectors already attached to the leads on the junction box cover Connect the leads in the control cable to those on the junction box cover according...

Page 10: ...terminal block regardless of the color s of the wires in the control cable that connect them 4 Re secure the signal power access door to the scoreboard NOTE Even if the control cable was not buried in...

Page 11: ...ONNECTED TO THE SCOREBOARD A 120 VOLT CIRCUIT MUST ALSO BE INSTALLED IN A STANDARD DUPLEX OUTLET AT THE SCOREKEEPER S LOCATION FOR THE CONTROLLER S 12 VOLT DC WALL TRANSFORMER IF AN EXTERNAL BATTERY P...

Page 12: ...will briefly display the controller s software version When the display changes and reads SELECT DIAG MODE DIGIT TEST press ENTER The LCD will now read SEGMENT TEST ALL SEGMENTS OFF Pressing the UP ar...

Page 13: ..._____ Date Installation Completed _________________________________ Company or Person Responsible For Installation address phone number ________________________ This document confirms that the install...

Reviews: