![background image](http://html.mh-extra.com/html/spm/ipro-kit-autofill-pre-mix/ipro-kit-autofill-pre-mix_instruction-and-maintenance-manual_1349089005.webp)
Data di emissione:
Luglio, 2013
Revisione:
1
Pag. :
5/15
1.
INSTALLATION AND OPERATION PROCEDURES
After replacing the machine standard lid by the Autofill cover, it is necessary to precisely
connect the automatic filling system.
Connect to each cover the JG elbow (A) and the connection for hose stem (B).
CONNECTION TO THE HOSE FOR THE PRODUCT
Join one of the two ends to the connection and fit
the other end into the product container; insert a
single check valve E just outside the container as
indicated in the picture.
!WARNING!
It is essential to effect the sanitization
procedures of the syrup circuit at least once
a week and every time the type of product is
changed.
Replace the tank full of product by a tank
full of sanitizing liquid and execute some
dispensing cycles;
Execute some additional 3 or 4 cycles
replacing the sanitizing liquid by hot water
in order to rinse the whole system;
The system is ready to dispense the syrup.
E