Data di emissione:
Dicembre, 2018
Revisione: 2
Pag. :
32/68
- Stop the freezing system (by switching off the
snowflake or the waves button) and let the
machine run with the only auger activated (all
LED switched off) for ten minutes.
- Bring KAY-5
®
Sanitizer/Cleaner with a 100ppm
dilution (1 Oz packet of KAY-5
®
+2 ½ gallons of
water) (the sanitizing product shall comply with
40 CFR §180.940).
!IMPORTANT!
The type and concentration of sanitizing
agent shall comply with 40 CFR §180.940
!IMPORTANT!
Carefully follow the instructions of the
sanitizer manufacturer with regard to
timing and method of use.
- Wash and disinfect hands thoroughly before
performing cleaning operations otherwise use
clean and sanitized gloves.
- After unlocking the main cover with its key
(fig.10), remove the main cover and the
secondary one under it (fig.11).
- Pour lukewarm water into the bowl (fig.12)
and, after re-positioning the main cover, make
the scraper auger rotating for some minutes (all
LED switched off).
NOTE
GT is equipped with a very efficient safety
mechanism, activated when the cover is lifted,
designed to protect the operator.
If the cover
is not correctly positioned GT will not work.
- Empty the bowl and repeat the same
operations until the coming out water is clear
(fig.13).
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Summary of Contents for GT Push 1
Page 62: ...Data di emissione Dicembre 2018 Revisione 2 Pag 62 68 15 WIRING DIAGRAM ...
Page 63: ...Data di emissione Dicembre 2018 Revisione 2 Pag 63 68 ...
Page 64: ...Data di emissione Dicembre 2018 Revisione 2 Pag 64 68 ...
Page 65: ...Data di emissione Dicembre 2018 Revisione 2 Pag 65 68 ...
Page 66: ...Data di emissione Dicembre 2018 Revisione 2 Pag 66 68 ...