9
www.SereneLife.com
3. Vertical Legs Assembly
4. Filling of the pool
•
The following applies to pool liners with hose connectors. The pool was purchased with a filter pump, insert
one of the two plugs (8 & 9) into the filter pump outlets. Please follow the Filter Pump Instructions first and
then proceed to next installation step.
•
Before filling the pool with water, ensure that the drain plug (1) inside the pool is closed and that the drain
cap (2) on the outside is screwed on tightly. Fill the pool with no more than 1 inch. (2.5 cm) of water.
Check to see whether the water is level.
Water level
4
For 8"x20" (244cm x 51cm):
Attach the legs end cap (4) to the bottom of each leg (7)
first. With the beams and T-joints assembly resting on the
ground, insert the top of the leg into the bottom of the
T-joint (3) (see drawing 3.1). Continue the process with
all the vertical legs.
NOTE:
This pool size does not come with an all-around
center belt.
Lift the beams assembly and make sure all the legs are a
vertical position (see drawing 3.2). Push all the T-joints
downward to ensure they are firmly connected to the legs.
For 10" (305cm) and above sizes:
Attach the legs end cap (4) to the bottom of each leg (7)
first. With the beams and T-joints assembly resting on the
ground slide one vertical leg into the belt loop located
in the middle of the pool liner and insert the top of the
leg into the bottom of the T-joint (3) (see drawing 3.3).
Continue the process with all the vertical legs.
•
Lift the beams assembly and make sure all the legs are
in a vertical position (see drawing 3.4). Push all the
T-joints downward to ensure they are firmly connected
to the legs.
•
Pull gently in an outward direction, the bottom of the
leg making sure the leg is vertical and perpendicular
to the level ground.
3.1
3.2
4
3.3
3.4