XG200 Elliptical
10
1. Tilt the elliptical to one side and put something under the unit for support and install the three
levelers (
83
) for that side. Tilt the unit to the other side and install those three levelers (
83
). Level
the elliptical once it is positioned where it will be used. Screw the two middle levelers all the way
in and the front and rear levelers all the way in, then back them out about two or three turns.
Level the unit using only the front and rear levelers first, then adjust the middle levelers so they
touch the floor. Make sure to lock the levelers when finished.
2. Press the six plastic end caps (
71
) into the oval stabilizer tubes.
3. Unlock the black lever located near the flywheel at the end of the brake cable (
90
). This is
locked for shipping purposes, but also serves as a safety lock mechanism to prevent unauthor-
ized use of this machine.
LEVELERS & END CAPS
5