55
Step 4:
1. Attach LEFT OUTER HANDRAIL COVER (48)
to MAIN PANEL using 2 SCREWS (83) and 2
FLAT WASHERS (75).
2. Attach LEFT INNER HANDRAIL COVER (47)
to MAIN PANEL using 5 SCREWS (83).
3. Attach LEFT LOWER UPRIGHT COVER (40)
to MAIN FRAME (1) using 2 SCREWS (83),
2 FLAT WASHERS (75), and 1 long
SCREW (69).
4. Attach LEFT END CAP (42) to MAIN FRAME (1)
using 2 SCREWS (68).
5. Repeat to install right side covers (45, 46, 39, 41).
6. Reinstall the MOTOR COVER (37) using
the bolts removed in Step 1.
ATTENTION!
Make sure all screws are all firmly tightened after all parts have been installed.
Summary of Contents for CT 900 TFT
Page 23: ...23 WFI Army Navy...
Page 24: ...24 Air Force Marines Physical Efficiency Battery PEB For U S Federal Law Enforcement...
Page 40: ...40 EXPLOSIONSZEICHNUNG...
Page 68: ...68 WFI Army Navy...
Page 69: ...69 Air Force Marines Physical Efficiency Battery PEB For U S Federal Law Enforcement...
Page 85: ...85 EXPLODED VIEW DIAGRAM...