52
ASSEMBLY INSTRUCTIONS
Step 1:
1. Remove the unit from the box and put it on a flat and level floor.
2. Loosen the 8 screws holding the MOTOR COVER (37) in place and remove the cover.
3. Uncoil wiring harness and run wires through the RIGHT UPRIGHT (7). Use 5 BOLTS (65) and 5
LOCK WASHERS (79) to attach the RIGHT UPRIGHT (7) to the MAIN FRAME (1). Do not pinch
wires. Do not tighten before putting the console on.
4. Use 5 BOLTS (65) and 5 LOCK WASHERS (79) to attach the LEFT UPRIGHT (8) to the MAIN
FRAME (1). Do not tighten before putting the console on.
Summary of Contents for CT 900 TFT
Page 23: ...23 WFI Army Navy...
Page 24: ...24 Air Force Marines Physical Efficiency Battery PEB For U S Federal Law Enforcement...
Page 40: ...40 EXPLOSIONSZEICHNUNG...
Page 68: ...68 WFI Army Navy...
Page 69: ...69 Air Force Marines Physical Efficiency Battery PEB For U S Federal Law Enforcement...
Page 85: ...85 EXPLODED VIEW DIAGRAM...