Page 12 of 54
BEFORE STARTING TO INSTALL CHECK:
1.
Gas Pipe Work:
is it strong enough to supply this high power appliance?
Did you check the flow rates as shown on page 4?
2.
Air Ventilation:
First check if you are installing FR-850-V by checking the
data plate within the fire. If this model is installed you will need to install a
100cm2 air vent in the same room.
3.
Chimney:
is it the correct size and length for the fire you are installing?
Check the technical section on page 4. Has it been tested for leaks?
Building and Installation Work
Gas Supply
Consult the Data Plate within the appliance to ensure the correct gas type and
pressure is available within the property. Before commencing to create the fire
opening for the inglenook unit note that a gas supply is required. The gas
supply pipe should run into the installed enclosure from either the rear, left or
right hand sides, the gas supply is best run through the right side of the
enclosure. CHECK GAS SUPPLY RATE BEFORE INSTALLING (SEE PAGE 4)
The fire has an 8mm inlet via an isolation valve. The fire also includes a
pressure test point elbow to test inlet pressure. The gas pipe work should be
routed into the enclosure via the available access holes. If the gas pipe work is
over 1.5mtrs in length it is recommended that the pipe work is increased in
diameter from this point to 15mm, 22mm and possibly 28mm depending on the
length to the meter – see technical section for gas consumption. This will
ensure a stable gas supply.
Building Work
It is important that the gas supply is disconnected before any old existing
surround and hearth is removed. Measuring from the floor surface, the intended
location of the base of the enclosure unit is marked onto the wall. Allowances
must be made for the steel gather, if required.
The enclosure should be located centrally to the existing flue/chimney at your
desired height. If the fire is not placed central to the chimney, the flame picture
may pull incorrectly. The area indicated on the wall must be removed to house
the Fire enclosure and burner unit. In some installations it may be necessary to
install a small lintel above the opening, if so an allowance must be made to
accommodate this lintel. (The Fire does not have its own lintel). After removing