Spirax Sarco UIB45 Installation And Maintenance Instructions Manual Download Page 3

IM-P113-04 

CMGT Issue 2

3

UIB45 Sealed Inverted Bucket Steam Trap for use with Pipeline Connectors

Safe operation of this product can only be guaranteed if it is properly installed, commissioned, 

used and maintained by qualified personnel (see Section 1.11 ) in compliance with the operating 

instructions. General installation and safety 

instructions for pipeline and plant construction, as well as the proper use of tools and safety 

equipment must also be complied with.

Warning

The inner and outer gaskets used when installing/maintaining the UIB to a PC_ pipeline connector 

contain thin stainless steel support rings which may cause physical injury if not handled and 

disposed of carefully.

 

1.1 Intended use

Referring to the Installation and Maintenance Instructions, product marking and Technical 

Information Sheet, check that the product is suitable for the intended use/application. The UIB45 

complies with the requirements of the EU Pressure Equipment Directive/UK Pressure Equipment 

(Safety) Regulations and falls within category 'SEP'. 

It should be noted that products within this category are required by the Directive not to carry 
the 

 mark.

i) The UIB45 has been specifically designed for use on steam, air or condensate/water which is 

in Group 2 of the above mentioned Pressure Equipment Directive. The products’ use on other 

fluids may be possible but, if this is contemplated, Spirax Sarco should be contacted to confirm 

the suitability of the product for the application being considered.

ii) Check material suitability, pressure and temperature and their maximum and minimum values. 

If the maximum operating limits of the product are lower than those of the system in which it 

is being fitted, or if malfunction of the product could result in a dangerous overpressure or 

overtemperature occurrence, ensure a safety device is included in the system to prevent such 

over-limit situations.

iii) Determine the correct installation situation and direction of fluid flow. 
iv) Spirax Sarco products are not intended to withstand external stresses that may be induced by 

any system to which they are fitted. It is the responsibility of the installer to consider these 

stresses and take adequate precautions to minimise them.

v)  Remove protection covers from all connections and protective film from all name-plates, where 

appropriate, before installation on steam or other high temperature applications.

1.2 Access

Ensure safe access and if necessary a safe working platform (suitably guarded) before attempting 

to work on the product. Arrange suitable lifting gear if required.

1.3 Lighting

Ensure adequate lighting, particularly where detailed or intricate work is required.

1.4  Hazardous liquids or gases in the pipeline

Consider what is in the pipeline or what may have been in the pipeline at some previous time. 

Consider: flammable materials, substances hazardous to health, extremes  of  temperature.

1. Safety information

Summary of Contents for UIB45

Page 1: ...1 Safety information 2 General product information 3 Installation 4 Commissioning 5 Operation 6 Maintenance 7 Spare parts Copyright 2022 Printed in GB 1133550 2 UIB45 Sealed Inverted Bucket Steam Trap...

Page 2: ...IM P113 04 CMGT Issue 2 2 UIB45 Sealed Inverted Bucket Steam Trap for use with Pipeline Connectors...

Page 3: ...if this is contemplated Spirax Sarco should be contacted to confirm the suitability of the product for the application being considered ii Check material suitability pressure and temperature and thei...

Page 4: ...s Before starting work ensure that you have suitable tools and or consumables available Use only genuine Spirax Sarco replacement parts 1 10 Protective clothing Consider whether you and or others in t...

Page 5: ...in environments where they may be exposed to temperatures below freezing point 1 15 Disposal Unless otherwise stated in the Installation and Maintenance Instructions this product is recyclable and no...

Page 6: ...a variety of different pipeline connectors including PC10 Straight connector ASME 300 see TI P128 10 PC10HP Straight connector ASME 600 see TI P128 10 PC20 Straight connector with Y type strainer ASME...

Page 7: ...PMA Maximum allowable pressure 99 3 bar g 38 C 1 440 psi g 100 F TMA Maximum allowable temperature 425 C 56 bar g 797 F 812 psi g Minimum allowable temperature 29 C 20 2 F PMO Maximum operating press...

Page 8: ...e 1 Open isolation valves slowly until normal operating conditions are achieved 3 5 Inverted bucket steam traps do not permit rapid release of air On process applications in particular this can lead t...

Page 9: ...Fig 3 Pipeline connector 10 Fig 2 UIB45 Inverted bucket steam trap Table 1 Recommended tightening torques for suitably lubricated threads Item Part mm N m lbf ft 10 Connector screws 9 16 A F 30 35 22...

Page 10: ...lel to the connector Tighten the screws evenly and gradually to the recommended torque see Table 1 Open isolation valves slowly until normal operating conditions are achieved Check for leaks As conden...

Page 11: ...ket set 10 11 12 How to order spares Always order spare parts by using the description given in the column headed Available spares and state the size model no and pressure rating of the trap Example 1...

Page 12: ...IM P113 04 CMGT Issue 2 12 UIB45 Sealed Inverted Bucket Steam Trap for use with Pipeline Connectors...

Reviews: