Spirax Sarco LC2300 Installation And Maintenance Instructions Manual Download Page 10

IM-P402-72  AB Issue 6

10

1

2

3

Termination

box

Screen

Brown

Red

Orange

Black

Flying leads supplied

with PA20

(

approximate 300 mm [12"]

)

*

*

See PA20 Installation and Maintenance Instructions
for sensitivity selection

10

11

IN 1

12

LC2300
controller

Fig. 7  Loop powered 4 - 20  mA input

10

11

12

+

-

ON

1    2

Fig. 5

+

5.4 Connecting to a 4 - 20  mA level transducer

The controller can be connected to a self-powered or loop powered 4 - 20 mA level transducer
instead of a capacitance probe.
Connect wiring as shown in the Figures 6 and 7.

Fig. 6  Self-powered 4 - 20  mA input

11

12

+

-

ON

1    2

5.3 Wiring diagram UL version

PA20 preamplifier and LP20 capacitance probe
(see PA20 and LP20 Installation and Maintenance Instructions)

Common

See CAUTION in Section 5.1.

Ensure resistance from probe body to
pipework / boiler shell is less than 1 

W

.

Archive

Summary of Contents for LC2300

Page 1: ...e Instructions IM P402 72 AB Issue 6 4025350 6 1 General safety information 2 General product information 3 Installation 4 Setting up the controller 5 Wiring diagrams 6 Commissioning 7 Maintenance 8 F...

Page 2: ...em An independent high water alarm system must be fitted if it is considered a safety requirement In this case the relays must simultaneously isolate the feedwater supply and the boiler heat supply at...

Page 3: ...ut current is greater than 50 i e above the set point output current The amber LED 100 0 Indicates that the output is greater than 20 mA or less than 0 4 mA A three stage wave filter gives an averaged...

Page 4: ...ntain the integrity of the approval Maximum power consumption 6 VA 0 2 V Input 1 0 6 V Selectable inputs 0 20 mA 4 20 mA Input 2 opposite sense to input 1 0 20 mA 4 20 mA Note See separate literature...

Page 5: ...nt For the US and Canadian markets the controller must be wired in accordance with the National and Local Electrical Code NEC or Canadian Electrical Code CEC The controller and all connected circuits...

Page 6: ...switches to the positions shown in Figure 3 for the chosen functions Replace the printed circuit board Ensure that the LEDs engage with the holes in the front panel Replace the rear cover panel Note t...

Page 7: ...aves and high turbulence may otherwise cause continuous oscillation of the output signal giving over frequent valve movement The unit is supplied set to Filter 1 position the least damped response wit...

Page 8: ...earth A functional earth is used in order for the product to operate In this application the earth tank boiler shell is used as the common of the probe preamplifier It also provides a sink drain for a...

Page 9: ...rown Red Black LC2300 controller Screen Screen Fig 4 5 2 Wiring diagram standard version 4 20 mA Test Connect ammeter between Terminals 5 and 6 Do not disconnect loop This earth terminal is internally...

Page 10: ...ng to a 4 20 mA level transducer The controller can be connected to a self powered or loop powered 4 20 mA level transducer instead of a capacitance probe Connect wiring as shown in the Figures 6 and...

Page 11: ...are shown Wiring connections for other Spirax Sarco controllers transmitters are different and are given in the individual Installation and Maintenance Instructions Fig 8 Capacitance probe source Fig...

Page 12: ...g or maintenance of the controller is necessary Boiler water level controls and level alarms however do require testing and inspection General guidance is given in the UK Health and Safety Executive G...

Reviews: