Installing the clean room system
6.3
Installing the FBS-V series SuSi and EFBS-V series SuSi
NOTICE
Note the weight and mounting points of your laminar flow module, see
NOTICE
Handles may be obtained from Spetec for easier installation.
Use suitable lifting equipment for laminar flow modules.
Instead of a box made from acrylic glass panes, the FBS-V series SuSi and EFBS-V series SuSi have a clean
room strip curtain. Consequently, the four mounting points on the FMS series SuSi must be attached to a ceiling
mounting.
1
FMS series SuSi
2
Profile
3
Slot nut
4
Clean room strip curtain
5
Washer
5
Cap nut
1. Install the FMS series SuSi (1) on the ceiling of the building, see
Chapter 6.1, "Installing the FMS series SuSi"
2. Attach the clean room strip curtain (2) according to the mark by sliding the holes of the clean room strip
curtain onto the threaded rods.
3. Adjust the clean room strip curtain so that its ends seal flush with the device casing.
4. Secure the clean room strip curtain using washers (5) and cap nuts (6).
6.0 2020
33