SpectraLink Corporation
Installation—NetLink Telephony Gateway
NetLink SVP Server
Part Number: 72-0065-01-G.doc
Page 22
6. Pre-Installation
Verification
6.1 Verify Pre-Installation Requirements
Check the site to be sure pre-installation work has been completed correctly. This
includes:
•
Location chosen for the NetLink Telephony Gateway is adequate and power is
available.
•
Access points are interoperable with the SpectraLink Voice Priority and
coverage is adequate.
•
Telephone lines for the wireless devices are installed and properly terminated.
•
When installing a TGA116, the grounding terminal in the rear panel of each
unit must be electrically connected to earth ground. Consult the NEC and
local codes for instructions on making the connection to the ground.
•
Dedicated line is available for remote access to diagnostic modem.
•
Telephone system administrator is on-site to program the existing telephone
system.
6.2 Check
Components
The following items should be at the installation site.
•
NetLink Telephony Gateway
– Depending on the size of your system there
may be four or more NetLink Telephony Gateways which will be linked
together to support additional users.
•
AC Adapter
– Supplies power to the NetLink Telephony Gateway.
Use only the provided Class II AC Adapter with output
24VDC, 1A.
•
Screws
– Four, ¾ inch, #8 panhead screws for each NetLink Telephony
Gateway to be wall mounted.
•
Star Washers
– when installing multiple NetLink Telephony Gateways, two
per NetLink Telephony Gateway, to provide static protection.
•
ESD Bonding Straps
– when installing multiple NetLink Telephony
Gateways, one per NetLink Telephony Gateway, to provide static protection.