PN: 1725-36122-001_N.doc
55
Test System
The system should now be tested to ensure that it is functioning
correctly. Power cycle the system. Verify that all Base Stations
download and go to a running status. This takes about 30 seconds
after connecting the Base Station cable to the Base Station’s RJ-45
socket. During this period the Base Station’s LED will flash in several
sequences. At the end of this period the LED will be flashing yellow.
Test each Base Station:
While standing near the Base Station, use a registered handset and go
off-hook. Verify a clear dial tone. The Base Station’s LED should flash
green.
Verify proper registration and operation of each handset by
performing the following test:
1.
Press the
START
key on each handset. The extension number
should clear and you should hear dial tone. On some digital
systems, depending on how the telephone system is programmed,
you may have to select a line to get dial tone.
2.
Place a call to each handset to verify ring, answer, clear transmit,
and clear receive audio.
3.
Verify all programmed features on each handset.
4.
Press the
END
key. The line indicator should turn off.
Voice-test each Base Station
Walk around the installation site with a handset while making voice
calls to a deskset. Verify that both ends of the conversation are of
good quality on each Base Station.
8