
Commissioning
16 EN
12|2019
5 Commissioning
Before commissioning, check that the power network‘s
voltage and frequency values correspond to those indicated
on the pump’s name plate.
Ensure that the pump is completely submerged.
1. Open the taps completely.
2. Establish
power
supply.
It can take a short time for the water to reach the end of
the piping!
If the integrated sensor detects an absence of water, the
pump stops running. The sensor will make 4 attempts to start
the pump. If the pressure cannot be reset due to a lack of
water, the pump will keep the error message until the pump
is manually reactivated (by turning the power supply off and
on again).
Fig. .
The pump is equipped with an anti-blocking system.
Following 100 seconds of inactivity the pump will
automatically be turned on for 2 seconds. This prevents the
hydraulic parts from becoming blocked.
Summary of Contents for Zismatic 40/08 WE
Page 3: ...DE DE Originalbetriebsanleitung Zismatic...
Page 13: ...Sicherheit 12 2019 DE 11 Abb 1...
Page 24: ...Technische Daten 22 DE 12 2019 9 2 Kennlinie Abb 6...
Page 27: ...EN EN Translation of original operation manual Zismatic...
Page 47: ...Technical data 12 2019 EN 21 9 2 Characteristics Fig 6...
Page 50: ......
Page 51: ......