Installation
14 EN
12|2019
4.2 Pipes
4.2.1 Laying
pipes
Keep the pressure line as straight as possible.
Avoid sudden changes to the cross-section and direction.
In cases where the geodetic head is significant, the pipe
dimensioning must be adjusted in order to guarantee an
almost loss-free flow.
NOTE
The non-return valve is already built into this pump.
Do not use any other valve!
The diaphragm pressure vessel must be installed in the
pressure line. The installation should take place as close to
the pump/well shaft as possible or in the cistern.
When using plastic hoses, these must withstand the pressure
of the pump. Kinks in the pipe should be avoided in order to
achieve normal function of the pump and the required water
quantity.
4.3 Installation
Fig. 3
D
The geodetic head from the pump position to the highest point of
the installation should amount to a maximum of 30 m.
Summary of Contents for Zismatic 40/08 WE
Page 3: ...DE DE Originalbetriebsanleitung Zismatic...
Page 13: ...Sicherheit 12 2019 DE 11 Abb 1...
Page 24: ...Technische Daten 22 DE 12 2019 9 2 Kennlinie Abb 6...
Page 27: ...EN EN Translation of original operation manual Zismatic...
Page 47: ...Technical data 12 2019 EN 21 9 2 Characteristics Fig 6...
Page 50: ......
Page 51: ......