Commissioning/Decommissioning
26 EN
01|2020
6 Commissioning/Decommissioning
6.1 Commissioning
NOTICE
Make sure that the pool does not overflow and cause property
damage.
Check that there is a drain.
Check whether a safety time is set.
6.2 Functional
test
6.2.1 Function
start
The BADU BNR 400 starts with the program. The LED indicates
certain operating states. See point 3.1.5 on page 11.
The status screen is shown in the display when starting.
6.2.2 Shut-off
fittings
The correct operation of the refilling device must be checked
separately. A solenoid valve or fast ball valve is usually used for
this.
Summary of Contents for BADU BNR 400
Page 3: ...DE DE DE Originalbetriebsanleitung BADU BNR 400 ...
Page 34: ......
Page 35: ...EN EN EN Translation of original operation manual BADU BNR 400 ...
Page 66: ......
Page 67: ...FR FR FR Traduction des instructions d utilisation originale BADU BNR 400 ...
Page 100: ......
Page 101: ...NL NL NL Vertaling van de oorspronkelijke gebruikershandleiding BADU BNR 400 ...
Page 132: ......
Page 133: ...IT IT IT Traduzione del manuale d istruzioni originali BADU BNR 400 ...
Page 164: ......
Page 165: ...ES ES ES Traducción de las instrucciones originales para el manejo BADU BNR 400 ...
Page 197: ......
Page 198: ......