![Speck pumpen BADU BNR 400 Operation Manual Download Page 57](http://html.mh-extra.com/html/speck-pumpen/badu-bnr-400/badu-bnr-400_operation-manual_1341776057.webp)
Installation
01|2020 EN
23
Contact load
Z1, Z2
maximum 2 A, 250 V~ AC3
11, 12, 14
maximum 2 A, 250 V~ AC3
Connection load
Lp, Np
maximum 4 A, 250 V~ AC3
Rocker switch
The rocker switch installed on the front turns the whole device on
and off.
The light on the rocker switch displays the operational readiness.
If the device is turned off, no contact information can be output via
Z1-Z2.
5.3.1 Terminal
connection
table
Fig. 3
Summary of Contents for BADU BNR 400
Page 3: ...DE DE DE Originalbetriebsanleitung BADU BNR 400 ...
Page 34: ......
Page 35: ...EN EN EN Translation of original operation manual BADU BNR 400 ...
Page 66: ......
Page 67: ...FR FR FR Traduction des instructions d utilisation originale BADU BNR 400 ...
Page 100: ......
Page 101: ...NL NL NL Vertaling van de oorspronkelijke gebruikershandleiding BADU BNR 400 ...
Page 132: ......
Page 133: ...IT IT IT Traduzione del manuale d istruzioni originali BADU BNR 400 ...
Page 164: ......
Page 165: ...ES ES ES Traducción de las instrucciones originales para el manejo BADU BNR 400 ...
Page 197: ......
Page 198: ......