14
STEP 12
Insert the Handlebar Post (7) onto the tube of the Main Frame (1) and align bolt holes.
Attach the Handlebar Post (7) onto the tube of the Main Frame (1) with two Hexagon Socket
Pan Head Cap Bolts (19), two Hexagon Socket Pan Head Cap Bolts (70), and four Washers
(10) from the tube of the Main Frame (1) that were removed. Tighten bolts with the Allen
Wrench provided.
STEP 13
Remove one Cross Recessed Pan Head Bolt (40) and one Washer (41) from the Tension
Control Knob (54). Remove bolts with the Multi Hex Tool with Phillips Screwdriver
provided.
Summary of Contents for Magnetic 800
Page 7: ...6 EXPLODED VIEW ...