33
3.
Concrete
Béton
Beton
Concreto
1
2
3
Fill Line
WARNING!
TWO CAPABLE ADULTS REQUIRED FOR THIS PROCEDURE.
FAILURE TO FOLLOW THIS WARNING COULD RESULT IN
SERIOUS INJURY AND/OR PROPERTY DAMAGE.
Completely seal the hole at the bottom of the bottom pole with heavy-duty tape (not included) to retain the rebar (9)
and concrete inside. Mix the concrete (approximately 100 lbs. (45.4 kg)) and fill the pole 1” - 2” (2.54 - 5.0 cm) below
the bottom elevator hole on top pole section (1) as shown.
9
Heavy-Duty Tape (Not Included)
IMPORTANT!
FAILURE TO FILL YOUR POLE COMPLETELY
WITH CONCRETE AS DESCRIBED IN THESE
INSTRUCTIONS, WILL VOID ALL WARRANTIES
WRITTEN AND IMPLIED.
Hormigón