13
IMPORTANT!
CONTINUE ON TO NEXT STEP. DO NOT WAIT FOR CONCRETE TO CURE.
Insert the ground sleeve assembly and center in the hole (
FIG. A
).
5.
1" (2.54 cm)
1" (2.54 cm)
1" (2.54 cm)
SIDE VIEW
FLANGE
Leave 1” below flange exposed for drainage hill.
NOTE:
FIG. A
PLAYING SURFACE
IMPORTANT!
NOTE THE POSITION
OF THE FLANGE
IMPORTANT!
CONTINUE ON TO NEXT STEP. DO NOT WAIT FOR CONCRETE TO CURE.
3
Fill the hole completely with concrete.
6.
1" (2.54 cm)
1" (2.54 cm)
1" (2.54 cm)
5
4