background image

Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com 

Page 3  

PREPARE COMPONENTS

Arms

Rotation Arm A:

 Attach 2 Arm 

Holder B on each side of 1 Arm 

Sheath, and insert 1 Arm Lock

.

Arm Holder B

Shaft Installation Side

Arm Holder B  

Shaft Installation Side

Arm Sheath 

Arm Wrench 

Step 1: 

Interlock Base and Double 

Base in the 3 configurations as 

shown on the following page.

B

BASE ASSEMBLY

Step 2: 

Press Big Base Holders 

and Small Base Holders onto the 

base configurations as shown on 

the following page.

Arm Holder B

Arm Holder A  

Arm Installation Side

Shaft Installation Side

Arm Sheath 

Arm 

Arm Wrench

Rotation Arm B:

 Attach 1 Arm 

Holder B and 1 Arm Holder A 

to 1 Arm Sheath. Then insert 1 

Arm Clip into Arm Holder A, and 

attach 1 Arm Lock. 

 

Rotation Arm C:

 Attach 1 Arm 

Holder B and 1 Arm Holder A to 

1 Arm Sheath. Then insert 1 Arm 

Clip into Arm Holder A and attach 

1 Arm Lock, and turn the lock 

clockwise. Don’t turn the lock too 

tightly to avoid marring. 

A

Summary of Contents for Level 7

Page 1: ...ot intended for children under 3 This product is intended for users 8 years of age and older To avoid choking keep small parts away from children Use caution this product contains parts with sharp edg...

Page 2: ...dels or 3 Size C Batteries Wire Cutters Pen or Marker Arm Clip x80 Arm Holder A x80 Arm Sheath x100 Arm Holder B x100 Arm Lock x180 Base x13 Big Base Holder x6 Small Base Holder x8 Double Base x2 Elev...

Page 3: ...lowing page B BASE ASSEMBLY Step 2 Press Big Base Holders and Small Base Holders onto the base configurations as shown on the following page Arm Holder B Arm Holder A Arm Installation Side Shaft Insta...

Page 4: ...Level 1 13 Bases 9 Small Base Holders 6 Big Base Holders Base Level 2 1 Double Base Indicated by Base Level 2 will attach atop of the 200mm shafts F K O P G L P R Base Level 3 1 Double Base Indicated...

Page 5: ...de onto the shaft NOTE There should be no space between the Power Box and the Helix If the Elevator Helix is not installed correctly the elevator will not run NOTE Make sure convex parts point upward...

Page 6: ...ay fall out if it enters too quickly Shaft Connector Insert Shaft Connector at the top of shafts and push into shafts until secure Specific shafts indicated on pages 11 and 16 by Rotation arms Attach...

Page 7: ...vator 2nd Floor Elevator 1st Floor Elevator 2nd Floor Elevator 3rd Floor Elevator 1st Floor Elevator F ELEVATOR POSITIONS Install each elevator on its respective base level floor Below is a 3D renderi...

Page 8: ...each shaft NOTE Shaft lengths and rotation arms are not to scale in the illustration Shafts and arm placement at 1 1 scale are shown in the tri fold Rotation Arm A Rotation Arm B Rotation Arm C F G B...

Page 9: ...l rights reserved www seaich com Spacerails LLC www spacerails com Page 9 H SHAFT PLACEMENT LEVEL 1A B M F L G P F K O BACK FRONT 1st Floor Elevator Step 1 Place shafts in the base of Level 1 where th...

Page 10: ...ach shaft NOTE Shaft lengths and rotation arms are not to scale in the illustration Shafts and arm placement at 1 1 scale are shown in the tri fold AE Z X W V S T R Q 0 300mm 212mm 124mm 0 200mm 107mm...

Page 11: ...seaich com Spacerails LLC www spacerails com Page 11 J SHAFT PLACEMENT LEVEL 1B B M X R L G P F Q T S U AG AA Y AC AB AF AE W V Z AD AH K O BACK FRONT 1st Floor Elevator Step 1 Place shafts in the ba...

Page 12: ...nto each shaft NOTE Shaft lengths and rotation arms are not to scale in the illustration Shafts and arm placement at 1 1 scale are shown in the tri fold U AA 0 159mm 0 200mm AB 0 200mm 113mm 190mm AF...

Page 13: ...seaich com Spacerails LLC www spacerails com Page 13 B M X R L G P F Q T S U AG AA Y AC AB AF AE W V Z AD AH K O BACK FRONT 1st Floor Elevator L SHAFT PLACEMENT LEVEL 1C Step 1 Place shafts in the ba...

Page 14: ...aft for Levels 2 3 NOTE Shaft lengths and rotation arms are not to scale in the illustration Shafts and arm placement at 1 1 scale are shown in the tri fold Rotation Arm A Rotation Arm B Rotation Arm...

Page 15: ...s reserved www seaich com Spacerails LLC www spacerails com Page 15 BACK FRONT N D I E J 2nd Floor Elevator 1st Floor Elevator SHAFT PLACEMENT LEVEL 2 Step 1 Place shafts in the base of the Level 2 wh...

Page 16: ...s reserved www seaich com Spacerails LLC www spacerails com BACK FRONT A C H 2nd Floor Elevator 3rd Floor Elevator 1st Floor Elevator SHAFT PLACEMENT LEVEL 3 Step 1 Place shafts in the base of the Lev...

Page 17: ...close as possible to the elevator entrance and exit for a smooth run The track needs to be a smooth curve that provides the Marble an easy entry into the elevator entrance A poor angle of the rail ca...

Page 18: ...oasting and consistent traveling Keep rails smooth and free of bumps or kinks Before a curve the rails should be adjusted to reduce the Marble s speed A steep decline just before a curve will give the...

Page 19: ...attaching Rail Clips for any rail segments that need additional support Outer Loop Inner Loop The track needs a steep incline to gain speed to travel through the loops smoothly While creating multipl...

Page 20: ...for full size drawings of the rail measurements Step 2 Cut each section at a 90 angle to the correct length Use these informational elements to understand how to best install the rail to its proper p...

Page 21: ...V 1 Z 2 X 2 AD 2 AC 2 AD 1 AC 1 Y 1 T 2 3rd Floor Exit This illustration has been separated into two parts for more clarity Step 1 Install 2 PCS of 1150cm rail as shown Steps 1 2 are using the same 11...

Page 22: ...ll rights reserved www seaich com Spacerails LLC www spacerails com U ASSEMBLE RAILS K 1 L 1 L 3 L 2 P 1 R 1 V 3 AC 3 AD 3 AH AG T 1 O 1 Q 1 O 2 S 2 Y 2 1st Floor Entrance 1 Step 2 Continue installing...

Page 23: ...eaich Corporation LLC All rights reserved www seaich com Spacerails LLC www spacerails com Page 23 V ASSEMBLE RAILS Step 3 Install 2 PCS 100cm rail as shown N 1 E 1 1st Floor Exit 1 2nd Floor Entrance...

Page 24: ...Page 24 Seaich Corporation LLC All rights reserved www seaich com Spacerails LLC www spacerails com W ASSEMBLE RAILS Step 4 Install 2 PCS 100cm rail as shown N 3 C 1 2nd Floor Exit 3rd Floor Entrance...

Page 25: ...his illustration has been separated into two parts for more clarity M 2 G 1 X 1 X 2 AB 1 AA 1 U 1 S 1 AB 2 B 3 1st Floor Exit 2 Step 5 Install 2 PCS of 450cm rail as shown Steps 5 6 are using the same...

Page 26: ...ration LLC All rights reserved www seaich com Spacerails LLC www spacerails com ASSEMBLE RAILS 10 interlocking Loop section M 1 G 1 B 2 B 2 1st Floor Entrance 2 Y Step 6 Continue installing the 2 PCS...

Page 27: ...Seaich Corporation LLC All rights reserved www seaich com Spacerails LLC www spacerails com Page 27 Z REFERENCE IMAGES Refer to these finished rail set images while installing SIDE SIDE TOP FRONT BACK...

Page 28: ...Seaich Corporation 1910 West 1040 South Salt Lake City UT 84104 833 732 4242 orders seaich com Spacerails LLC www spacerails com...

Reviews: