Page 4
Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com
C
BASE ASSEMBLY
F
K
G
L
O
P
D
I
E
J
Base Level 1:
13
- Bases
9
- Small Base
Holders
6
- Big Base
Holders
Base Level 2:
1
- Double Base
Indicated by:
Base Level 2 will
attach atop of the
200mm shafts: F, K,
O, P, G, L, P, R
Base Level 3:
1
- Double Base
Indicated by:
Base Level 3 will
attach atop of the
base level 2, 200mm
shafts: D, E, I & J.
Assemble base components as shown
in the following configurations.