Page 10 of 24
3.4 Ventilation
The installation room should have a volume of at least 10m
³
/kw of installed nominal heat input of the radiant
heater.
The ventilation requirements and calculation methods for unflued appliances are set out in the European
Standards
EN 13410:2001
and must be applied. The following is guidance to the standard:
Ventilation may be achieved by any of the three following different means:
a) thermal evacuation of the products of combustion/air mixture
b) mechanical evacuation of the products of combustion/air mixture
c) natural
air
change
3.4.1.1 Ventilation by Thermal Evacuation
Ventilation by thermal evacuation is sufficient if
10m
³
/h of exhaust air per kW of operating heat input
are
ventilated out of the installation room.
The air/products of combustion mixture must be evacuated above the radiant heaters, if possible near the ridge,
by means of exhaust mixture opening(s), (vents).
Where the exhaust mixture opening(s) can be closed, it shall only possible to operate the radiant heaters when
they are open.
The maximum horizontal distance between a radiant heater and a vent opening shall be:
6 (six) times the vent height in the case of
wall
openings
3 (three) times the vent height in the case of
roof
openings
G/Y
TERMINAL BLOCK
2
1
7
GR = GREY
7
7
G/Y
BL (HT)
6
GR
G/Y
BL
BR
G/Y = GREEN & YELLOW
WIRING COLOUR CODES
BR = BROWN
BL = BLUE
BK = BLACK
12 WAY 0.2 PITCH
KK CONNECTOR
4262107
S.I.T. (0.537.008) IGNITION CONTROL - 4262535
SRP 30 Hi/Lo
10
11
12
6
7
9
8
4
5
3
2
1
L1
BL
G/Y
BR
BY-PASS VALVE
(SRP 30 Hi/Lo)
BK
3
3
4 PIN BASE PLUG
L2
N
7
BL
2
1
BR
7
Summary of Contents for SRP 08
Page 2: ......
Page 25: ...Page 23 of 24 NOTES...