2
4
5
6
7
12
17
18
19
20
23
24
24
25
26
CONTENTS
FRESH WATER USE ONLY
NOT INTENDED FOR OPERATION OUT OF WATER
NOTICE
1
PRE-INSTALLATION CHECK
READ THIS FIRST
TOOLS REQUIRED
INCLUDED PARTS
INSTALLATION
A: CONNECTION TO CABLE
B: ATTACH NICHE ADAPTOR
C: CONNECT LUMINAIRE
D: FIT LIGHT INTO NICHE
POST INSTALLATION CHECK
WINTERIZATION
TROUBLESHOOTING
ELECTRICAL GROUNDING
FCC COMPLIANCE STATEMENT
KEY DIMENSIONS
APPENDIX A