
Description of BMS-8N(V) stud welding devices
Operating Instructions Soyer Bolzenschweißtechnik
19
6.3 Overview of the controls
Figure 1: Overview of the front panel
Item
Designation
a
Up arrow key to increase the charging voltage or the stud diameter
(depending on the display settings).
b
Display for showing the charging voltage or the stud diameter.
c
Up arrow key to decrease the charging voltage or the stud diameter
(depending on the display settings).
d
Display of operating states, see chapter “6.3.2 Displaying the operat-
ing states” on page 22.
e
Support table for the selection of the charging voltage fitting the stud.
f
Carrying handle.
g
Socket for the connection of the control cable (stud welding gun).
h
Socket for the connection of the welding cable (stud welding gun).
i
Connector for the connection of the earth cable.
a
b
h
d
e
c
f
i
g