The Quality Name in High Voltage Switching 

 

Southern States, LLC 

Equipment Receipt, Installation, Use, Operation and Maintenance Terms 

(“Terms of Use”) 

The purchaser (“Purchaser”) of certain Equipment (the “Equipment”)  identified in the Instruction 

Manual accompanying these Terms of Use  sold by Southern States, LLC (“Southern States”), by 

Purchaser’s acceptance or Use of Equipment in any way, agrees to the Terms of Use set forth below 

(the word “Use” herein means receipt, testing, inspection, installation, operation, maintenance and 

otherwise handling the Equipment): 

 

Purchaser represents and warrants that it is fully qualified to Use the Equipment, and that it is 

a sophisticated user of the Equipment with a high level of expertise in the Use of the Equipment 

and Purchaser knows that Southern State is relying on Purchaser’s sophistication and expertise 

with respect to the Equipment. 

 

The Purchaser will, within seven (7) days after receipt of the Equipment, inspect the Equipment 

and identify and notify Southern States in writing of any missing parts, damage or defects 

observed in the Equipment. 

 

The Purchaser will Use the Equipment, only in conformity with all manuals, data sheets and 

instructions provided by Southern States, and in keeping with sound engineering, utility and 

safety practice.  Purchaser will at its own expense, provide all necessary labor, supplies, and 

facilities required to Use the Equipment.  

o

 

The Purchaser may use its own personnel or engage a third party to Use the Equipment.  

The Purchaser shall insure that it only utulizes personnel who are fully qualified or 

certified by a reputable certification agency to Use the Equipment. In the event that 

Purchaser cannot find such qualified personnel, the Purchaser will notify Southern 

States and seek its advice to determine a mutually agreeable solution.  

o

 

By separate agreement, Southern States may provide such services and the personnel 

to conduct such services in connection with the installation of the Equipment. In the 

event Southern States agrees to provide personnel to install, maintain, and operate the 

Equipment, such personnel will function only in an advisory capacity and shall have no 

responsibility for the supervision, or the quality or workmanship of such installation, 

maintenance, or operate of the Equipment.  

 

The Purchaser shall not install and operate the Equipment in a way such that a single point of 

Equipment  failure leads to a cascading event or consequential damage to any person or 

property. Purchaser shall ensure redundancy in its system at all times. Purchaser acknowledges 

and agrees that electric service is by nature subject to interruptions due to Equipment failures 

and shall not agree to provide service free from the effects of Equipment failures 

 

The Equipment will be maintained and inspected as provided by this instruction manual and in 

compliance with best industry practices, but in no event will the Equipment be inspected and 

tested less frequently than once in every 6 months.  

 

WCSR 40690314v3

 

Summary of Contents for EV-2H

Page 1: ...Type EV 2H Aluminum Vertical Break Disconnect Switch thru 245 kV INSTRUCTION INSTALLATION MANUAL...

Page 2: ...Page II The Quality Name in High Voltage Switching...

Page 3: ...Page III The Quality Name in High Voltage Switching Safety Information...

Page 4: ...his manner will constitute the Warranty Holder s exclusive remedy and fulfillment of all SSLLC s liabilities and responsibilities hereunder SSLLC s duty to perform under this limited warranty may be d...

Page 5: ...t o The Purchaser may use its own personnel or engage a third party to Use the Equipment The Purchaser shall insure that it only utulizes personnel who are fully qualified or certified by a reputable...

Page 6: ...tly and solely caused by Southern States negligence For the purposes of clarity Southern States shall not be liable and be fully indemnified by the Purchaser for the following related to the Equipment...

Page 7: ...Page VII The Quality Name in High Voltage Switching Type EV 2H Aluminum Vertical Break Disconnect Switch Thru 245 kV...

Page 8: ...ng 5 Storage 5 Installation Adjustment Procedures 6 Assembly 6 1 Preferred Switch Assembly Method 6 2 Contact Adjustment 8 3 Mounting disconnect switch onto the structure 10 4 Optional Accessories 10...

Page 9: ...oth Sides 8 Figure 6 Blade Tip Travel 9 Figure 7 Blade Tip Must Be As Flat in the Jaw as Possible 9 Figure 8 Arcing Horn Attachment 10 Figure 9 Sling Attachment 11 Figure 10 Proper Mounting Positions...

Page 10: ...ire obligations of Southern States The Warranty contained in the contract between the parties is the sole warranty of Southern States Any statements contained herein do not create new warranties or mo...

Page 11: ...quipment variations and potential conditions Contact Southern States LLC in the event conditions associated with a specific application are not sufficiently addressed All photographs and sketches in t...

Page 12: ...ues Table 1 Recommended Tools and Torque Values Recommended Tools Recommended Torque Values Type Sizes Bolt Nut size Torque Ft lb Hand Wrenches and or Sockets 15 16 3 4 5 8 9 16 1 2 40 Drill Bit 1 4 5...

Page 13: ...he switch base to the structure Installing operating components Final adjustment or tuning is then completed A Terminal Pad Assembly G Blade M Bearing B Crank Arm H Insulator Adapter N Insulator C Bla...

Page 14: ...h the carrier and contact the factory Storage All components of the EV 2H vertical break disconnect switch are suitable for outdoor use and do not have any special storage requirements If a motor oper...

Page 15: ...the insulator bearing hub switch arm and rotating base to ensure correct reassembly See Figure 2 Match mark A to B and B to C Failure to complete this step will make final adjustment more difficult 1...

Page 16: ...gure 5 Usually bolt hole tolerances will be sufficient to align the contacts properly However the jackscrews that support the jaw insulator stack can also be used to tilt the insulator as required 1 6...

Page 17: ...tip as shown in Figure 4 If necessary use the jack screws that support the jaw insulator to tilt the insulator fore or aft to align these parts Figure 4 Contact blade centered among contact fingers 2...

Page 18: ...it as required Note By adjusting all jackscrews equally count the flats and previous adjustment will not be disturbed Never attempt to force the blade tip into the jaw Any attempt to adjust the contac...

Page 19: ...the switch is fully closed as shown in Figure 8 If necessary the jaw stationary arcing horn may be bent to achieve proper contact Figure 8 Arcing Horn Attachment 4 Mounting disconnect switch onto the...

Page 20: ...n Figure 10 Figure 10 Proper Mounting Positions 4 6 1 Conventional blade open positions are shown in Figure 10 The EV 2H switch will be shipped with one of these blade open angles unless another angle...

Page 21: ...the stop bolt Figure 11 BLADE STOP OPEN POSITION 4 8 If possible mount the conductors to both ends of the switch pole before adjusting switches 4 9 Conductor loads can alter fine switch adjustments so...

Page 22: ...f the end insulator of each switch pole 5 2 Figure 13 shows a typical operating mechanism for a 145kV vertical break switch Figure 14 shows alternate operating mechanism designs each of which is emplo...

Page 23: ...er necessary components Refer to Figure 15 Do not connect the interphase pipe at this time Figure 15 Typical Operating Arrangement 5 7 CAUTION The pipe collar above the vertical bearing support must s...

Page 24: ...perly adjusted connect the interphase pipe and continue tuning the other two phases Care should be taken to ensure that the operating mechanism only exerts enough force to toggle the blade tip perpend...

Page 25: ...re 17 Type SEGO Safety Enhanced Gear Operator 6 2 3 Swing handle operator 6 2 3 1 Adjust stops on handle mount after adjusting switch 6 2 3 2 When the switch is properly adjusted the handle should han...

Page 26: ...ition 6 4 Final Adjustment 6 4 1 Before piercing any pipes always check that none of the clamped joints have slipped If slippage occurs correct it and repeat the operation to verify that adjustment is...

Page 27: ...ighten bolts and test operate readjust as necessary 6 4 5 All poles of the fully adjusted disconnect switch should operate together although a slight variance between poles is acceptable The primary o...

Page 28: ...es on the switches which can be eliminated during normal switch maintenance Table 2 Recommended Installation and Maintenance Table Installation Tests Patrolling Inspection 6 months Routine 5 Year Peri...

Page 29: ...se during any operation or maintenance cycle as exposed surfaces such as contacts are vulnerable to environmental conditions and contaminants that can decrease the effectiveness of the grease over tim...

Page 30: ...orgia Avenue Hampton Georgia 30228 Phone 770 946 4562 Fax 770 946 8106 E mail support southernstatesllc com http www southernstatesllc com 2021 Southern States LLC IB 101 EV2H 245 R6 02152021 Printed...

Reviews: