HT-S200F/SF200/SF201
20
2-17. MAIN BOARD
q;
MAIN board
hole
notch
hole
+RZWRSDVWWKHFXVKLRQ49$
guide line
guide line
cushion (QV, A)
front side
MAIN board
MAIN board
OK
NG
NG
–
79,1237,&$/MDFNVLGHYLHZ
–
cushion (QV, A)
cushion (QV, A)
cushion (QV, A)
rib
rib
rib
left side
top side
right side
front side
2
two screws
(BVTP3
u
10)
3
heatsink (VK)
5
screw
(B3
u
5)
A
A
6
bracket (HDMI) assy
Note 2:
When installing the bracket (HDMI) assy,
align the two ribs and two holes.
rib
hole
4
screw
(BVTP3
u
10)
4
screw
(BVTP3
u
10)
7
two screws
(BVTP3
u
10)
8
chassis
Note 3:
When installing the chassis,
align the two ribs and notch, hole.
1
TOUCH board
connection
harness
(W015SYT90SYT)
9
cushion (QV, A)
The position of the
dotted circle of the
cushion (QV, A) is
cohered with the
TV IN (OPTICAL)
jack.
The cushion (QV, A)
is over from the TV
IN (OPTICAL) jack.
The position of the
dotted circle of the
cushion (QV, A) is
risen from the TV
IN (OPTICAL) jack.
TV IN (OPTICAL) jack
MAIN board
TV IN (OPTICAL) jack
MAIN board
TV IN (OPTICAL) jack
TV IN (OLPTICAL)
jack
Bend.
Note 1:
When the MAIN board is replaced, refer to
“SPREADING OF COMPOUND” on page 4.
SYS SET
2021/02/16 22:34:59 (GMT+09:00)