25
HCD-L7HD
PRECAUTION DURING GEAR (RT) ASSY, GEAR (KT), GEAR (S2) INSTALLATION
gear (KT)
gear (RT) assy
gear (RT) assy
torsion spring (M)
gear (S2)
gear (S2)
pulley (LDG2)
lever (ST)
cam (A)
Confirm that the gear (S2) mark is located
in between the gear (RT) assy marks.
Rotate the pulley (LDG2) until it reaches the position
where the cam (A) contacts with the lever (ST).
Install the gear (KT) and position it so that the boss
that is closest to the inside is located at the 9 o'clock position.
The boss that is closest to the inside
Install the gear (RT) assy so that the two bosses are aligned
in between the torsion spring (M).
Install the gear (S2) so that its hole is located at the 9 o'clock position.
Summary of Contents for HCD-L7HD
Page 39: ...39 39 HCD L7HD 6 7 Schematic Diagram MOTOR Section ...
Page 42: ...42 42 HCD L7HD 6 10 Schematic Diagram HDD1 Section 1 2 See page 62 for Wavefoms ...
Page 46: ...46 46 HCD L7HD 6 14 Schematic Diagram HDD2 Section 2 2 FOR MEMORY STICK NOT USED ...
Page 49: ...49 49 HCD L7HD 6 17 Schematic Diagram MAIN Section 1 2 See page 62 for Wavefoms ...
Page 55: ...55 55 HCD L7HD 6 23 Schematic Diagram AMP Section See page 62 for Wavefoms ...
Page 57: ...57 57 HCD L7HD 6 25 Schematic Diagram DISPLAY Section See page 62 for Wavefoms ...
Page 59: ...59 59 HCD L7HD 6 27 Schematic Diagram CONTROL Section See page 62 for IC Block Diagrams ...
Page 61: ...61 61 HCD L7HD 6 29 Schematic Diagram POWER Section ...
Page 95: ...95 HCD L7HD MEMO ...