
48
HCD-HPX9
4-9. ASSEMBLING OF THE GEAR (SUB GEAR PIN RIGHT)
1
Turn over the stocker assy
in the direction of the arrow.
2
Remove the arm (R)
in the direction of the arrow.
4
two screws
(2
×
5)
3
two dowels
6
Adjust phases.
gear (sub gear pin right)
gear (stock rotary right)
gear (stock joint)
7
washers (5.5)
5
gear (sub gear pin right)
PRECAUTION DURING GEAR
(SUB GEAR PIN RIGHT) INSTALLATION
UPPER
SIDE
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299