
47
HCD-HPX9
4-8. ASSEMBLING OF THE LEVER (SUB GEAR BACK L)
1
Turn over the stocker assy
in the direction of the arrow.
2
Adjust phases.
gear (stock rotary left)
gear (sub gear pin left)
qa
k tapping screw
(2.6
×
8)
0
screw (M2
×
5)
9
cover (L)
7
lever
(sub gear back L)
8
SPR-T
(sub gear back L)
SPR-T (sub gear back L)
gear (stock rotary left)
sub gear (joint just front)
6
lever (joint just front)
gear (sub gear pin left)
5
gear (stock joint),
shaft (stock)
lever (sub gear back L)
PRECAUTION DURING SPR-T
(SUB GEAR BACK L) INSTALLATION
PRECAUTION DURING GEAR
(SUB GEAR PIN LEFT) INSTALLATION
UPPER
SIDE
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299