5-19
5-11. TG2 RETAINER, TG2 ARM ASSEMBLY (TG2 PLATE SPRING AND ET MAGNET),
S TENSION REGULATOR BAND ASSEMBLY AND TG2 LOAD ARM ASSEMBLY
1. Removing
1
. Tension coil spring (TG2), spring adjustor, LM motor block
assembly and TG2 spring hook. (Refer to 5-9)
2
. TG2 retainer.
Claw
TG2 retainer
3
. Set the
LOADING
position. (Refer to page 5-3)
4
. TG2 arm assembly and S tension regulator band assembly.
Claw
S tension regulator
band assembly
S reel table
PH-W
TG2 arm assembly
5
. S tension regulator band assembly, TG2 plate spring and ET
magnet.
Special head screw
(M1.4
×
2.5)
TG2 plate spring
ET magnet
S tension regulator band assembly
6
. TG2 load arm assembly.
Claw
PH-U TG2 load arm assembly
2. Attaching
1
. Set the
UNLOADING
position. (Refer to page 5-3)
2
. Attach the parts in the order of
6
→
3
→
5
→
4
→
2
→
1
.
3
. Operation check:
LOADING
/
UNLOADING
. (Refer to page
5-3)
4
. Adjust them according to the flowchart (START-2) on page
5-43.
PH-U , PH-W : Page 5-11
Summary of Contents for DSR-20MD
Page 9: ...1 2 ...
Page 10: ...1 3 ...
Page 11: ...1 4 ...
Page 12: ...1 5 ...
Page 13: ...1 6 ...
Page 14: ...1 7 ...
Page 15: ...1 8 ...
Page 16: ...1 9 ...
Page 17: ...1 10 1 10 E ...
Page 223: ... 294 DSR 20MD 20MDP 9 974 189 11 Sony EMCS Co 2007E0500 1 2007 5 Published by Kohda TEC ...