C:\2030940_ACYRK81\4665334011\4665334011ACY_RK81GB\01GB02C01-WW.fm
masterpage: Right
ACY-RK81
4-665-334-01 (1)
Checking the Package Contents
11
Checking the Package
Contents
After opening the package, make sure that all of the
following items are present. Contact your dealer if
anything is missing.
Rail assembly (2)
L-shaped bracket (2)
Screws
• Operating Instructions (this manual)
Preparation
In order to mount the AIT library, first mount the rails
and brackets on the library and rack.
Before beginning work, always be sure to turn off the
AIT library, and then disconnect all cables.
Pull Out the Inner Rails
Pull out the inner rails from the rail assemblies.
1
Pull out the inner rail from one of the rail
assemblies as far as it will go.
The rail can be extended until the locking arm on
the back of the rail emerges.
2
Turn the rail assembly over. Slide the locking arm
to release the lock, and then pull the inner rail all of
the way out.
3
Repeat the process with the other rail assembly,
pulling out its inner rail.
Note
The inner rail will be mounted on the AIT library,
while the rail assembly will be mounted on the rack.
Type
Quantity
Special screw (M4)
8 (2 spare)
Set screw
6 (2 spare)
A screw (B4~6)
6 (2 spare)
Back of rail assembly
Locking arm
Rail assembly
Inner rail
Summary of Contents for ACY-RK81
Page 16: ...Printed in Japan ...