background image

 

Tel: +44 (0)1732 861200  -  E-mail: [email protected]  -  Web: www.sontay.com 

© 2017 Sontay Limited. All rights reserved 

Page 2 of 4 

 

RE-3P-105 

3-Phase Panel Mount 105kW 

Issue Number: 7.0 

Date of Issue: 02/01/2018 

 

 

Four Elms Road 

 Edenbridge 

Kent 

 TN8 6AB 

 UK 

 

 

SAFETY REQUIRMENTS & ADVICE SHEET 

 
Introduction  
The objective of this leaflet is to provide information to ensure that the safety of the person(s) installing or maintaining the equipment is not 
compromised and its location and method of installation does not endanger others, either during or after installation.  Customers should be aware 
of the Health and Safety at Work Act 1974 (HSW 1974) and the EC “Provision and Use of Work Equipment Regulations 1992” (PUWER). Both are 
available from the Health and Safety Executive (HSE) publications, within the UK. 
  
Installation  
 
CE Directives 
These are European regulations which apply to our industry. They affect the equipment emissions and immunity to Radio Frequency Interference 
(RFI) and various elements of safety for electrical equipment. 
The European Community ‘CE’ Directives that mainly concern Sontay Ltd are the Low Voltage Directive (LVD) and the Electromagnetic Compliance 
Directive (EMC).  
A Declaration of Conformity may be supplied with the product or supplied on request. 
 

 

Torque Settings 
Good working practises must be adhered to ensuring appropriate electrical and mechanical installation. This would include the mechanical fixing of 
potentiometer bushes and electrical set screw and/or pillar connections. These Electrical Connections and Mechanical Fastenings must not be over 
tightened. We would recommend a typical torque setting of 1 to 5Nm.  For specific product information, see appropriate product data sheet, 
where applicable. 
  
Cooling Requirements 
The use of an additional heatsink (this could be a conductive panel) suitably attached or mounted with the unit, will help to dissipate heat away 
from the device(s).  An alternative or additional method would be forced air-cooling (using a fan), to assist the natural convection of airflow over an 
existing heatsink within the unit.  The product fins should be mounted in line with the forced and/or natural airflow.          
The equipment’s environment and its initial ambient temperature also need to be considered, as this could have an adverse effect on the overall 
operating conditions.   
 
Fusing 
We recommend that semiconductor, fast acting to BS88 IEC 269, type fuses or circuit breakers (Semiconductor - MCB) should be used for unit 
and/or device protection.  The appropriate maximum load current should be known to select the required fuse or MCB, but must not exceed the 
equipment rating.  The I² t (A² s) rating of the selected fuse must be less than that of the equipment so as to protect the equipment’s discrete 
device.  Further appropriate fusing may be required for protection of the unit supply using standard fuse links and holders.  Failure to address 
these requirements and the use of incorrectly selected fuses may cause the equipment to fail.   
  
Earthing 
The protective conductor terminal of the equipment must be utilised at all times and bonded to a ‘good’ Earth (ground).  The earth bonding 
(strapping) leads of any combined equipment should be as short as possible and be substantial, i.e. at least rated higher than the equipment’s 
load.  For further information, refer to BS7671. Following these simple guidelines will ensure optimum use of any appropriate filter circuits which 
may be required.   
  
Insulation (over-voltage category) and Protection from electric shock Classification of Equipment 
All equipment, unless otherwise stated, is rated to CLASS II Insulation (Over-voltage category) and CLASS I (Protection category). 
 
Maintenance  
Before any servicing is carried out, reference should be made to appropriate installation instructions, drawings and labelling which may come with 
the equipment.  Personnel should switch off the unit supply before accessing or removing any safety cover and be aware of hazardous live parts. 
 
Safety Interlocks for Sontay RE Electric Heater Battery Controllers 
 
Sontay Ltd. recommends that the installation and maintenance of all RE electric heater battery controllers should be done with reference to BS 
7671:2008+A3:2015 (Requirements for Electrical Installations. IET Wiring Regulations). 
 
All users of the IET Wiring Regulations should be aware of changes in Amendment No. 3 to the 17th Edition. Amendment No. 3 came into effect on 
1 July 2015. 
 
For international installations, please refer to local regulations for guidance. 
 

Reviews: