
6 | Electrical installation
46 / 60
Installation instructions sonnenBatterie eco 9.43
6.8.2 Connecting the BMS communication lines
1
POWER
LINK-IN
LINK-OUT
CONTROLLER
RS232
STATUS
POWER
POWER
LINK-IN
LINK-OUT
CONTROLLER
RS232
STATUS
POWER
CONTROLLER
CONTROLLER
CONTROLLER
Illustration 50: Connecting the CONTROLLER
line
Connect the patch cable installed in
the main cabinet to the CONTROL-
LER socket on the first battery mod-
ule.
Connect the supplied patch cable as shown in the following illustration. The
connection for each one runs from
LINK-OUT to LINK-IN.
1
POWER
LINK-IN
LINK-OUT
CONTROLLER
RS232
STATUS
POWER
Illustration 51: Connecting the BMS communication lines
Summary of Contents for sonnenBatterie eco 9.43
Page 59: ......
Page 60: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried...