Sonnen sonnenBatterie eco 9.43 Installation Instructions Manual Download Page 1

Installation instructions | for authorised electricians

sonnenBatterie eco 9.43

KD-446 • Part no. 22213 • Version X03

[email protected] • 

sonnen.de

Summary of Contents for sonnenBatterie eco 9.43

Page 1: ...Installation instructions for authorised electricians sonnenBatterie eco 9 43 KD 446 Part no 22213 Version X03 info sonnen de sonnen de...

Page 2: ...Email info sonnen de Document Document number 446 Part number 22213 Version X03 Valid for AU Publication date 04 06 2018 IMPORTANT Read this documentation carefully before installation operation Retai...

Page 3: ...onditions during storage 13 4 1 2 Storing the battery modules 13 4 2 Transport 13 4 2 1 Ambient conditions during transport 13 4 2 2 Transporting battery modules 13 4 2 3 Inspecting for transport dama...

Page 4: ...y modules 44 6 8 2 Connecting the BMS communication lines 46 6 8 3 Connecting the battery lines 47 6 9 Installing covers 49 6 9 1 Connecting earthing conductor 49 6 9 2 Installing the cover of the ext...

Page 5: ...his document Complete designation Designation in this document sonnenBatterie eco 9 43 Storage system 1 3 Explanation of symbols DANGER Extremely dangerous situation leading to certain death or seriou...

Page 6: ...e to comply with the conditions of the warranty and the information specified in this document invalidates any warranty claims 2 2 Requirements for the electrician Improper installation can result in...

Page 7: ...e system 5 min The storage system contains live electrical parts which poses a risk of electrical shock The storage system inverter also contains capacitors which carry voltage even after the storage...

Page 8: ...s Only firefighters with appropriate protective equipment safety gloves safety clothing face guard breathing protection are permitted to enter the room where the burning storage system is located Ther...

Page 9: ...e LiFePO4 Max capacity 2 5 kWh 5 0 kWh 7 5 kWh 10 0 kWh 12 5 kWh 15 0 kWh Usable capacity 2 25 kWh 4 5 kWh 6 75 kWh 9 0 kWh 11 25 kWh 13 5 kWh Nominal voltage 48 V Current Max continous 75 A Short cir...

Page 10: ...00 m above sea level Pollution degree 2 Additional ambient conditions The installation location must not be at risk of flooding Installation room can be ventilated The currently applicable building co...

Page 11: ...rical supply net work XDIO Digital inputs and outputs Interface to emit and receive digital signals XSO1 USB port Port for connection of an Z Wave USB stick XSO2 Modbus port Data connection to power m...

Page 12: ...3 4 Symbols on the outside of the storage system Symbol Meaning Warning flammable materials Warning hazards due to batteries Warning electrical voltage 5 min Warning electrical voltage Wait five minu...

Page 13: ...l level Deep discharge could damage or destroy the battery modules For this reason the battery modules can only be stored for a limited amount of time Observe the following points The battery modules...

Page 14: ...ery modules under any circumstance Notify the service team CAUTION Insulation fault when storage system is damaged Danger of electric shock when touching damaged insulation elements Unpack the storage...

Page 15: ...hidden damage This inspection should also take place in the presence of the shipper if possible Unpack the goods Inspect the goods for hidden not immediately visible transport damage If transport dama...

Page 16: ...ge to the storage system Check the inside of the storage system for condensation before installa tion Only install the storage system if there is no condensation on the sur faces If the temperature of...

Page 17: ...extension cabinet 1 Main cabinet 1 Battery module 1 Small extension cabinet 2 Power meter WM271 2 BMS communication line short 2 Edge protection 3 Modbus line with RJ 45 coupling C For big extension...

Page 18: ...llustration 3 Minimum distances Observe the specified minimum dis tances to neighbouring objects The minimum distances ensure that there is sufficient heat dissipation the storage system door can be o...

Page 19: ...t the optional extension cabinet must be mounted to the wall with screws A storage system with the extension cabinet must be floor mounted WARNING Inadequate protection against contact if installed wi...

Page 20: ...on an optional pedestal 3 in stead of the levelling mat This is helpful if the extension cabinet doesn t meet flush with the wall e g because a skirting board 2 is mounted 1 3 2 Illustration 8 Levelli...

Page 21: ...A Main cabinet B Small extension cabinet from 2 5 up to 10 kWh C Levelling mat height 10 mm or pedestal opt height 80 mm 241 966 1029 1221 1622 524 996 B A C 225 33 626 A 809 1805 Illustration 10 Dril...

Page 22: ...achments 2 mm Illustration 12 Distance between screw head and wall Apply suitable screws and anchors see Requirements for mounting ma terial P 20 to the previously drilled holes The screw should not b...

Page 23: ...the previ ously mounted screws 6 Tighten the screws Illustration 16 Tightening the screws Tighten the five screws 7 Connect the housing optional If an extension cabinet is used both cabinets need to...

Page 24: ...d to exceed a maximum length of 30 m 6 1 Working on the electrical distributor 6 1 1 Placing components in the electrical distributor Several components must be placed in the electrical distributor fo...

Page 25: ...ach case The type of RCCB must be selected depending upon the the local conditions of the public electricity network 6 1 2 Wiring components in the electrical distributor The power meter wiring shown...

Page 26: ...ing 2 Current transformer for generation L1 11 Storage system 3 Current transformer for generation L2 12 Miniature circuit breaker B16 4 Current transformer for generation L3 13 RCD in TT networks 5 P...

Page 27: ...for generation L2 12 Miniature circuit breaker B16 4 Current transformer for generation L3 13 RCD in TT networks 5 Transformer interface for generation A1 14 Bidirectional counter 6 Transformer inter...

Page 28: ...tion L2 2 A2 input for consumption 9 Current transformer for generation L3 3 Voltage measurement terminal strip 10 Transformer interface for consumption 4 Power meter 11 Current transformer for consum...

Page 29: ...p on current transformers must not be connected L1 L2 L3 N PE 3 1 2 1 2 3 1 2 3 1 2 3 L1 N PE Illustration 24 Connecting the clamp on current transformers for three phase left and single phase right i...

Page 30: ...ation Consumption Voltage Metering Spannungsmessung 1 2 3 4 5 6 A1 A2 13 14 15 16 1 2 Illustration 26 Removing the front cover Press the clips 2 on both sides of the power meter You might use a small...

Page 31: ...til the setting 3P 2 3P appears 1 2 3 4 5 6 1 Illustration 33 SYS screen setting 3P 2 3P Press for a longer period of time until the sign 1 disappears 1 2 3 4 5 6 Illustration 34 SYS screen after chan...

Page 32: ...re permitted to carry out electrical work Connect the wires for the mains line as shown in Figure Circuit diagram overview electrical connection at single phase mains P 26 or Circuit diagram overview...

Page 33: ...Ethernet cable to the router of the home net work 2 XS03 1 2 Illustration 38 Connecting the Ethernet line 1 Patch cable not included in scope of delivery 2 Home network router XSO3 Ethernet port on t...

Page 34: ...dbus line for the power meter6 Connect the patch cable 1 as it is shown in the following figure 1 2 3 6 XSO2 A1 A2 13 14 15 16 1 2 3 4 5 6 7 8 4 5 7 Illustration 39 Connecting the modbus line 1 Patch...

Page 35: ...correct wiring of the system In some cases the permission of the distribution grid operator or power supply company may be required External components terminals contactors relays etc needed to wire u...

Page 36: ...yellow 0 25 0 5 24 50 DO PV reduction 2 grey 0 25 0 5 24 50 DO min max SOC red blue 0 25 0 5 24 50 DI CHP BHKW white pink 0 25 0 5 24 50 DI CEI 0 21 Remote shutdown grey brown 0 25 0 5 CEI 0 21 Inver...

Page 37: ...the green PV reduction 1 and yellow PV reduction 2 wires respectively If PV reduction 1 is activated 24VDC applied to the green wire K71 energises and the K71 make contact closes K72 energises as soo...

Page 38: ...esignation 48 Series Modular interface Prerequisite The PV inverter has a suitable interface for power control e g an interface for a ripple control receiver Wire the PV reduction digital outputs as s...

Page 39: ...ion Configuring software settings The switching behavior of the self consumption switch can be configured using the commissioning assistant see Commissioning assistant P 52 Adjust the switch on thresh...

Page 40: ...t see Commissioning assistant Set suitable values for the min SoC and max SoC variables N K2 A1 A2 N L 1 M 1 2 Illustration 45 Activating deactivating a CHP 1 CHP 2 Contact for activating CHP K2 Exter...

Page 41: ...4 VDC 1 N L 1 M GYPK RDBU 2 L N 3 4 6 5 GND 24 VDC Illustration 46 CHP with operating contacts 1 Signal line 2 Digital input CHP 3 CHP K3 Floating operating contacts for the combined heat and power st...

Page 42: ...put CHP 3 CHP K3 Current operated relay Application example Combined heat and power station without operating contacts A combined heat and power station 3 without operating contacts 3 can be wired up...

Page 43: ...manually The Power key is only intended for service purposes and only authorised ser vice technicians are permitted to use it Nevertheless if a battery module has been switched on manually Press and h...

Page 44: ...LLER RS2 32 STA TUS POW ER POW ER LINK IN LINK OU T CON TRO LLER RS2 32 STA TUS POW ER POW ER LINK IN LINK OU T CON TRO LLER RS2 32 STA TUS POW ER POW ER LINK IN LINK OU T CON TRO LLER RS2 32 STA TUS...

Page 45: ...e arranged correctly as shown in illus tration Earthing the battery modules P 45 Tighten the self locking nut s with a torque of 5 Nm POW ER LINK IN LINK OU T CON TRO LLER RS2 32 STA TUS POW ER POW ER...

Page 46: ...ONTROLLER Illustration 50 Connecting the CONTROLLER line Connect the patch cable installed in the main cabinet to the CONTROL LER socket on the first battery mod ule Connect the supplied patch cable a...

Page 47: ...e connected together black to black Ensure that the battery line plugs noticeably click into the sockets When connecting the battery lines observe the following The plus line is connected to the plus...

Page 48: ...on instructions sonnenBatterie eco 9 43 If an extension cabinet is used Connect the battery lines as shown in the following illustration Illustration 53 Connecting the battery lines for up to 15 kWh s...

Page 49: ...er An earthing conductor 7 is connected to the optional extension cabinet 2 Connect the other end of the earthing conductor to the earth bolt 3 on the cover 1 Take care of the positioning of the com p...

Page 50: ...on cabinet Illustration 55 Mounting the cover of the ex tension cabinet Hook the cover into the front of the extension cabinet Mount the cover with the three screws Tighten the screws only slightly ma...

Page 51: ...n full Make a copy of the filled in commissioning report the original remains with the operator Send a scan of the commissioning report to the following e mail address within 5 working days service so...

Page 52: ...issioning assistant the storage system can be con figured The operator as well as the authorised electrician have to enter some in formation while the commissioning assistant is running The storage sy...

Page 53: ...is not displayed Follow the instructions in section Troubleshooting P 55 7 3 2 Running the commissioning assistant Select your preferred language from the language selection list 1 Select Installer fr...

Page 54: ...age system off to electrically isolate it P 54 off off F1 off Illustration 61 Fuse switch F1 on the top side of the storage system Switch off fuse switch F1 8 2 Switching the storage system off to ele...

Page 55: ...rnet portal https my sonnen bat terie com No connection between the storage system and the server Make sure that the Ethernet line between the storage system and the Router of the home network is corr...

Page 56: ...g new packaging can be requested from sonnen GmbH Never transport damaged battery modules CAUTION Improper disposal of battery modules Explosion or fire outbreak at battery modules or emission of toxi...

Page 57: ...tification number Storage system location only required if different from the address above Details on network topology mark off the applicable network Street TT TN S TN C S Post code town TN C classi...

Page 58: ...ase provide the following images along with the commissioning report on completion of a sonnen system install Example Example Complete storage system Battery Connection Door Open Main Fuse Board Syste...

Page 59: ......

Page 60: ...sonnen GmbH Am Riedbach 1 D 87499 Wildpoldsried...

Reviews: