Copyright © 2010 Somfy SAS. All rights reserved.
Sunea screen io
3
EN
Motor/tube assembly
3.3.
1) Slide the motor into the roller tube.
2) For safety reasons, fix the roller tube to the drive wheel
with 4 x Ø 5 mm self-tapping screws or 4 x Ø 4.8 mm
steel pop rivets located at least 5 mm from the outer rim
of the drive wheel (L1 - 5) and at most 15 mm from the
outer rim of the drive wheel (L1 - 15).
The screws or pop rivets must only be attached to the
drive wheel and not to the motor.
Installing the tube-motor assembly
3.4.
Insert the end-piece into the tube.
Star head motor:
3.4.1.
1) Fit the tube/motor assembly to the end bracket (C).
2) Fit the tube/motor assembly to the motor bracket (D).
Round head motor:
3.4.2.
1) Mount the support on the motor head, and then the
removable flange.
2) Slide the tube-motor-removable flanges assembly into the
head rail.
Always make a loop in the power supply cable to prevent
water entering the motor!
Comply with current standards and legislation when
installing.
Cut off the mains power supply.
-
Connect the motor according to the information in the
-
table below:
230 V ~ 50 Hz
Motor cable
1
Brown
Live (P)
2
Blue
Neutral (N)
3
Yellow/Green
Earth ( )
WIRING
4.
C
D
1
2
1
2
COMMISSIONING
5.
The guide only describes commissioning using a Situo io type Somfy io local control point. For
commissioning using any other io control point, refer to the corresponding guide.
Identifying setting steps already completed
5.1.
Only one motor should be powered at a time.
Switch on the power and follow procedure «a» or «b»,
according to the awning’s reaction:
15 mm
5 mm
20 mm
L1
1
2
1
2
3
1
2
3
OFF
230 V
~
50 Hz
3 x 1,5 mm
2
3 x 0,75 mm
2
ON
Summary of Contents for Sunea io
Page 43: ......