9
EN
- FREEVIA LINE installation and operating guide - SOMFY
EN
1.1 Unlock the motor
1.2 Installing the motor
Fastening the motor
to the ground
1
2
3
•
Position the installation
template
c
on the
ground and drill 4
holes using a drill bit (Ø
12 mm) suitable for the
type of ground.
•
Insert the plugs. Tighten the studs.
•
Tighten 4 nuts and 4 washers.
•
Remove the motor cover.
•
Position the motor on the studs: ensure that
the bracket (base of
the motor) is no more
than 25 mm above the
ground. The
recommended space
is between 20 and
25 mm.
•
Once the motor is
positioned at the right height in relation
to the ground, fix it in place using the 4
washers and 4 nuts.
•
Position the pre-drilled
grommet in the
opening provided for
the cable feed.
Position the motor's handle
The pinion is freed.
The motor is unlocked.
17
T25
12
Check that the motor is level.
INSTALLATION 1
EN