
50 User Manual UM0007_ASW3000-5000H-S_EN_V01_0321
6.9.2 BMS CAN cable connection
Procedure:
1) Remove the communication plate.
2) Loosen the swivel nut of the cable gland on the
communication plate, remove the sealing plug and lead the
stripped cable through the swivel nut, sealing sleeve,
communication plate and magnetic ring, crimp the crystal as
below pin assignment.
3) Insert the cystal to the socket, screw communication plate to
Object
Description
A
Smart meter: system monitoring
B
DRED
:
control the power to grid
C
RS485
:
communication
D
BMS
:
CAN communicate to battery