
Attach Swing & Glider Hangers
•Attach (4) Swing Hangers to the Single Beams. Stagger
hangers 2 per beam.
•Using (2) lag screws per hanger, attach the Glider Hanger to
the underside of the beams. Align the holes of the hangers
with the beam holes.
Note: Glider Hangers are fastened to the holes in Single Beam
closest to the fort side.
8B
Glider Hangers
Stagger the
Swing Hangers
3/8 x 3" Lag Screw
& 3/8 Flat Washer
IMPORTANT!
Swing Side uses this
triangle plate hole
IMPORTANT!
Fort Side uses this
triangle plate hole
CAUTION!
Lag Screws and washers
must be fastened tight
to the Glider Hangers
and the Single Beams
Front View
To install Swing
Hangers, screw in
until flush with beam.
Use liquid soap as
a lubricant for ease
of installation.
HARDWARE LIST
4 Swing Hangers
2 Glider Hangers
4 pcs 3/8x3" Lag Screw
4 pcs 3/8" Flat Washer
19