5. Commissioning
Step 6: After the initial settings are done, you will be taken to the home page where you will
see different icons. At the bottom of the page are four submenus: Home, Info, Settings, and
More.The Info page breaks down into four categories: Inverter, Battery, Grid, and Load.
inverter power production history, PV voltages and currents, inverter information
Inverter:
(serial number, model number, and firmware version), grid code, and alarm code history
battery model and status, battery voltage and current
Battery:
power imported and exported, AC grid voltage, frequency, and amperage
Grid:
power being consumed by the home loads and backup loads
Load:
There are two additional settings which need to be configured in order to complete the inverter
commissioning. Both of these settings can be found within the Settings submenu.
: the amount of power the inverter is permitted to export (or sell) back to
System Export Power
the utility company. If you do not want the system exporting power, this setting must be
configured.
: the power designated to the backup loads panel in the event of a grid power
Backup Power
loss